Mine infrastructure

New conveyor leading into box-cut

New conveyor leading into box-cutLocation: Carborough Downs Mine

The new conveyor was installed to transport coal out of the underground mine at Carborough Downs Coal Mine.

New mining infrastructure area

New mining infrastructure areaLocation: Moranbah North Coal Mine

PCE designed, documented and supervised the new mine infrastructure area at Moranbah North Coal Mine.

Stock pile transfer slab

photo12Location: Carborough Downs Mine

PCE undertook structural design and documentation and was extensively involved in constructing a major stock pile transfer slab at Carbourough Downs Mine.

Construction of transfer tower footing

photo17Location: Carborough Downs Mine

Extensive footings were constructed as part of the conveyor infrastructure, which transports coal from the underground mine to the coal handling preparation plant four kilometres away.