Mine Infrastructure

New Conveyor Leading into Box-cut
Location: Carborough Downs Mine The new conveyor was installed to transport coal out of the underground mine at Carborough Downs Coal Mine.
New Mining Infrastructure Area
Location: Moranbah North Coal Mine PCE designed, documented and supervised the new mine infrastructure area at Moranbah North Coal Mine.
Stock Pile Transfer Slab
Location: Carborough Downs Mine PCE undertook structural design and documentation and was extensively involved in constructing a major stock pile transfer slab at Carbourough Downs Mine.
Construction of Transfer Tower Footing
Location: Carborough Downs Mine Extensive footings were constructed as part of the conveyor infrastructure, which transports coal from the underground mine to the coal handling preparation plant four kilometres away.